Acceptance protocol for c250-S - Initial commissioning
Question: Is there a form available for an acceptance protocol for the safety controller?
Answer: You can find a corresponding acceptance protocol form in the attachment. The form must be filled in both by the commissioning engineer (e. g. Lenze employee) and by the machine manufacturer.